Perforated Steel Deck Before Merlin Deck Repair Was Applied
Rollover image to see before and after

<< back to case studies

Mubaraka Oil Supertanker

Merlin Epoxy Repair Compound use to repair perforated steel deck on a 600,000 barrel floating oil storage unit. The first area was completed in September 2003 with further areas treated in March 2006 and September 2007.

This project was carried out in conjunction with IMG Offshore Ltd, Abu Dhabi.

Products Used

Merlin Epoxy Repair Compound
Deck Repair System
contact us for more information